Timeline
-
Fiscal Year 2018 & 2019
- Project Design: July - October 2017
During this phase, the project plan is developed, familiarization workshops are held, and strategies for the implementation process are adopted. Basic system functionality is displayed by the consultants so the team can start preparing for configuration decisions to be made.
Conference Room Pilot 1 (CRP 1) is a series of demonstration meetings held near the end of this phase, which plays back preliminary functionality decisions for the project team and subject matter experts (SMEs).
- Configure: October 2017 - May 2019
During this phase, configuration decisions are made by the project team with the assistance of the consultants. The team starts to work in the system as it is being developed and begins testing processes to ensure intended results of transactions. SMEs are engaged throughout this phase to work with the team leads to test and validate configuration decisions.
CRP 2 & CRP 3 are series of meetings held during this phase where the team leads work first with their consultants and then with their SMEs to further refine functionality decisions and begin validating final design and configuration decisions. The team leads drive the system functionality during these meetings, with assistance from their consultants.
- Validate: October 2017 - May 2019
This phase takes place in conjunction with configuration, with final validation resulting in movement to the transition phase. CRP 3 should be conducted near the end of this phase.
- Project Design: July - October 2017
-
Fiscal Year 2019 & 2020
- Transition: May 2019 - September 2019
This phase includes migrating final configuration, integrations and extensions, and loading data to the production state. Validations and verifications are performed throughout this phase to get to operational readiness and begin production. This phase includes System Integration Testing (SIT) and User Acceptance Testing (UAT), and leads up to Go-Live. Training is developed and delivered during this phase.
- Realization: September 2019 - ongoing
This phase begins right before Go-Live and continues after. It includes managing transitions to get to steady state operations and ensuring post Go-Live support is available to users.
- Go-Live October 2019
- Transition: May 2019 - September 2019